Saturday 13 July 2013

Route 128 Corridor Study

The Boston area MPO studied the Route 128/I-95 Corridor from approximately 2005–2010. The study focused on the heavily congested section from I-90 (Newton) to US 3 (Burlington), and was completed in November 2010. As of 2010, the highway carried over 200,000 vehicles per day. Some possible improvements to Route 128 include HOV Lanes, reconstruction of shoulders, ramp metering, bus on shoulder, and fiber optic traffic system improvements. More studies will need to be completed before projects will begin.

No comments:

Post a Comment